Case Studies
View all our
Case Studies
-
Roundhay Two-Storey Extension, Dormer & Alterations
-
Tockwith Modern Pavilion
-
Burley in Wharfedale - Studio/Home Office
-
Huby Greenhouse
-
Cleckheaton Two-Storey Extension
-
Horsforth Extension & Basement Conversion
-
Harrogate Apartments
-
Huby Changing Room
-
Battersea Remodel & Refurb
-
Bramhope Refurbishment
-
Knaresborough Farmhouse
-
Aldwark Manor Hotel
Huby Changing Room
Completion Time: 1 Month
Budget: £25k
The client approached Bourke Build with a design to create a separate room to their spectacular swimming pool. The room was to be a changing room, walk in shower and bathroom next to the waterfall which conceals the room from the swimming pool, Bourke Build assisted with the design and completed the fit out. Dating back to the 14th century the historical deco panelling which is now extremely popular was installed on every wall, decorated with specialised paint to stop moisture damage in shade Luja 7 and then finished with gold ironmongery to achieve the final look.
“Sean and his team did a superb job for us, turning the unfinished shell of our extension into a fabulous bathroom/ changing area; including a walk in shower, panelled walls with tiled floor, lighting design and full decoration. His attention to detail is second-to-none and you really feel like he is a safe pair of hands. Sean communicates well at all stages, providing regular updates against the project plan and invoicing schedule. What’s more, he’s a likeable person who was a pleasure to work with. I would never hesitate to recommend Bourke Building and Refurbishment”